Utara Design Group

Architect: Utara Design Group
Project Type: Industrial
Client: Schweppes Zimbabwe
Terms: N/A
Strategy: Industrial Master Planning & Facility Redevelopment
Date: N/A

Design in Details

Responding to the operational and expansion requirements of a leading beverage manufacturer, Proposed Schweppes Facility Master Plan (FMP) in Willowvale, Harare is conceived as a strategic industrial development aimed at optimising production efficiency, logistics coordination, and long-term scalability.

The master plan is envisioned to reorganise and enhance the facility’s spatial framework by integrating production zones, warehousing, administrative functions, and circulation systems into a cohesive and high-performing industrial environment. The development prioritises operational flow, safety compliance, and brand presence while supporting long-term growth.

Design Inspiration

The architectural and planning concept draws inspiration from the dynamic nature of beverage production, fluid movement, precision, and continuous operation. The bold roof articulation reflects motion and energy, symbolising the production process while also serving practical environmental functions such as shading, weather protection, and drainage efficiency.

The integration of corporate colour accents reinforces Schweppes’ brand identity, ensuring the industrial facility maintains visual alignment with its corporate image. Clean structural lines and defined massing create a modern industrial aesthetic that communicates strength, reliability, and operational excellence.

Architectural Strategy

The master planning approach is structured around optimised workflow efficiency and controlled industrial zoning. The facility layout is proposed to clearly separate high-activity production areas from administrative and support functions while maintaining seamless operational connectivity.

The circulation system is carefully organised to ensure safe and efficient movement of heavy vehicles, delivery trucks, and internal transport routes without disrupting production continuity.

  • Production & Processing Zoning: Clearly defined operational areas structured to enhance workflow efficiency and safety compliance.
  • Warehouse Integration: Streamlined storage and distribution systems designed to improve logistical coordination.
  • Heavy Vehicle Circulation Planning: Dedicated access routes to optimise truck movement and reduce operational congestion.
  • Administrative & Corporate Interface: Office functions strategically integrated within the industrial framework.
  • Future Expansion Flexibility: Provision for phased facility growth without disrupting ongoing production.
  • Brand Visibility & Identity: Architectural elements reinforcing Schweppes’ corporate presence within an industrial context.
PROJECT STATUS Proposed
PLANNING STRATEGY Facility Master Plan
DEVELOPMENT TYPE Industrial Facility
SCALE APPROACH Expandable Framework

Incredible Result

Proposed Schweppes Facility Master Plan is envisioned to strengthen operational performance, improve logistical coordination, and elevate the industrial architectural standard within Willowvale. By combining strategic planning with contemporary industrial design principles, the development aims to position the facility for long-term productivity, efficiency, and sustainable growth.

Please add the YouTube video URL for the project!
Please add the Panorama Image for the project!
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare